The name of the introduction Order NO.1:Product main body |
The installation order At first to use carpentry openings for ∅125mm hole’s at install surface;and then put the order NO.2 and NO.3 and NO.4 into the order NO.1;next put the order NO.5 into the order NO.4, and Fixed on the threaded hole of order NO.3;According to the thread rotate upward to the top of the order NO.4;the last used the order NO.5 screw to fixed products.
|
Note:
When you found the products transportation is notsmoothly, please checking wheather the main power socket is loose or not; if the plug is loose,please use a larger effort to splice it closely,the products will be transportation smoothly. Please don’t Disassemble the product. May lead to leakage and other dangerous for installation is not correct.
Since its establishment, our factory has been developing first world class products with adhering the principle
of quality first. Our products have gained excellent reputation in the industry and valuabletrusty among new and old customers..